مشروع إحلال غشاء MBR لمياه الصرف الصحي البلدية بسعة 60,000 متر مكعب في اليوم في تركمانستان
نظرة عامة على المشروع
| البند |
التفاصيل |
| اسم المشروع |
Municipal Wastewater MBR Membrane Replacement Project |
| الموقع |
Turkmenistan |
| السنة |
June 2020 |
| التطبيق |
Municipal Wastewater Treatment |
| Treatment Capacity |
60,000m³/d |
| Project Type |
MBR Membrane Replacement |
| Supply Scope |
MBR Membrane Curtains |
| Delivery |
5 Batches |
خلفية المشروع
This project was part of a government procurement program for a municipal wastewater treatment plant. The plant was already operating with a biological + MBR process, and required replacement of aging membrane curtains to maintain system performance.
Instead of rebuilding the system, the client selected membrane replacement to upgrade the existing treatment process.
الحل العلاجي
The client provided technical specifications including membrane fiber and module parameters. Based on these requirements, membrane curtains were manufactured and supplied for system replacement.
A total of 5 batches of MBR membrane curtains were delivered and installed in the existing MBR system.
تكامل النظام
The supplied membrane curtains were directly integrated into the existing wastewater treatment system, replacing the old membranes without modifying the original process
النتائج الرئيسية
- Treatment plant capacity: 60,000m³/d
- 5 batches of membrane curtains delivered
- Successful integration into existing MBR system
- Stable operation after replacement
- Improved reliability of wastewater treatment process
أبرز مميزات المشروع
- MBR membrane replacement project
- Suitable for municipal wastewater treatment plants
- Custom production based on client specifications
- Compatible with existing system design
- Stable performance after installation
التطبيقات
- Municipal wastewater treatment plants
- MBR system upgrades and retrofits
- Membrane replacement projects
- Wastewater treatment plant maintenance