{"id":304,"date":"2026-04-09T14:56:10","date_gmt":"2026-04-09T06:56:10","guid":{"rendered":"https:\/\/banott.com\/?post_type=cases&#038;p=304"},"modified":"2026-04-27T10:01:00","modified_gmt":"2026-04-27T02:01:00","slug":"23m%c2%b3-h-well-water-drinking-treatment-project-in-romania","status":"publish","type":"cases","link":"https:\/\/banott.com\/es\/cases\/23m%c2%b3-h-well-water-drinking-treatment-project-in-romania\/","title":{"rendered":"Proyecto de potabilizaci\u00f3n de agua de pozo de 23 m\u00b3\/h en Ruman\u00eda"},"content":{"rendered":"<h2>Resumen del proyecto<\/h2>\n<p>Project Name: Well Water Drinking Project<br \/>\nLocation: Romania<br \/>\nYear: March 2019<br \/>\nCapacity: 23 m\u00b3\/h<\/p>\n<h2>Antecedentes del proyecto<\/h2>\n<p>The raw water source was well water with multiple parameters exceeding drinking water standards, including turbidity, ammonia, chloride, residual chlorine, total bacteria, nitrite, and nitrate.<\/p>\n<p>Among these, turbidity was significantly high, while other indicators were slightly above standard limits, requiring a combined treatment approach.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1083 size-full\" src=\"http:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project.webp\" alt=\"Well Water Drinking Project\" width=\"600\" height=\"400\" srcset=\"https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project.webp 600w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-300x200.webp 300w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-18x12.webp 18w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<h2>Soluci\u00f3n de tratamiento<\/h2>\n<p>A combined Ultrafiltration (UF) + Reverse Osmosis (RO) system was adopted to address different water quality issues effectively.<\/p>\n<p>UF System Capacity: 11 m\u00b3\/h<br \/>\nRO System Capacity: 12 m\u00b3\/h<br \/>\nTotal Output: 23 m\u00b3\/h (mixed water for drinking use)<br \/>\nThe system was designed as a containerized integrated solution (40\u201d HQ), enabling compact installation, easy transportation, and fast deployment.<\/p>\n<h2>Process Description<\/h2>\n<p>UF System Process<br \/>\nRaw Water Tank \u2192 Raw Water Pump \u2192 Quartz Sand Filter \u2192 Activated Carbon Filter \u2192 Security Filter \u2192 UF System \u2192 Product Water Tank<\/p>\n<p>RO System Process<br \/>\nRaw Water Tank \u2192 Raw Water Pump \u2192 Quartz Sand Filter \u2192 Security Filter \u2192 RO System \u2192 Product Water Tank<\/p>\n<p>A shared cleaning system (CIP) is used for both UF and RO systems<br \/>\nThe system is equipped with automatic electrical control<\/p>\n<p>Principales resultados<\/p>\n<p>System recovery rate: 74.2%<br \/>\nEffective removal of turbidity, bacteria, and suspended solids<br \/>\nReduction of nitrate, nitrite, and chloride through RO<br \/>\nStable drinking water quality achieved<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1085\" src=\"http:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-2.webp\" alt=\"Well Water Drinking Project\" width=\"600\" height=\"400\" srcset=\"https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-2.webp 600w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-2-300x200.webp 300w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-2-18x12.webp 18w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<h2>Project Advantages<\/h2>\n<p>Integrated UF + RO treatment solution<br \/>\nContainerized design for fast installation<br \/>\nStable operation with automated control system<br \/>\nSuitable for well water purification applications<\/p>\n<h2>Aplicaciones<\/h2>\n<p>Drinking water treatment from well water<br \/>\nRural and decentralized water supply<br \/>\nIndustrial and municipal water purification<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1084\" src=\"http:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-1.webp\" alt=\"Well Water Drinking Project\" width=\"600\" height=\"400\" srcset=\"https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-1.webp 600w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-1-300x200.webp 300w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Well-Water-Drinking-Project-1-18x12.webp 18w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>Se aplic\u00f3 un sistema UF + RO en contenedor para tratar agua de pozo en Ruman\u00eda, consiguiendo una calidad estable del agua potable con una capacidad total de 23 m\u00b3\/h.<\/p>","protected":false},"featured_media":305,"comment_status":"closed","ping_status":"closed","template":"","case_cat":[21,22,23],"class_list":["post-304","cases","type-cases","status-publish","has-post-thumbnail","hentry","case_cat-uf-system-applications","case_cat-ro-system-applications","case_cat-pure-water-treatment"],"acf":[],"_links":{"self":[{"href":"https:\/\/banott.com\/es\/wp-json\/wp\/v2\/cases\/304","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banott.com\/es\/wp-json\/wp\/v2\/cases"}],"about":[{"href":"https:\/\/banott.com\/es\/wp-json\/wp\/v2\/types\/cases"}],"replies":[{"embeddable":true,"href":"https:\/\/banott.com\/es\/wp-json\/wp\/v2\/comments?post=304"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banott.com\/es\/wp-json\/wp\/v2\/media\/305"}],"wp:attachment":[{"href":"https:\/\/banott.com\/es\/wp-json\/wp\/v2\/media?parent=304"}],"wp:term":[{"taxonomy":"case_cat","embeddable":true,"href":"https:\/\/banott.com\/es\/wp-json\/wp\/v2\/case_cat?post=304"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}