{"id":1145,"date":"2026-04-27T16:33:38","date_gmt":"2026-04-27T08:33:38","guid":{"rendered":"https:\/\/banott.com\/?post_type=cases&#038;p=1145"},"modified":"2026-04-27T17:02:05","modified_gmt":"2026-04-27T09:02:05","slug":"60000m%c2%b3-d-municipal-wastewater-mbr-membrane-replacement-project-in-turkmenistan","status":"publish","type":"cases","link":"https:\/\/banott.com\/ar\/cases\/60000m%c2%b3-d-municipal-wastewater-mbr-membrane-replacement-project-in-turkmenistan\/","title":{"rendered":"\u0645\u0634\u0631\u0648\u0639 \u0625\u062d\u0644\u0627\u0644 \u063a\u0634\u0627\u0621 MBR \u0644\u0645\u064a\u0627\u0647 \u0627\u0644\u0635\u0631\u0641 \u0627\u0644\u0635\u062d\u064a \u0627\u0644\u0628\u0644\u062f\u064a\u0629 \u0628\u0633\u0639\u0629 60,000 \u0645\u062a\u0631 \u0645\u0643\u0639\u0628 \u0641\u064a \u0627\u0644\u064a\u0648\u0645 \u0641\u064a \u062a\u0631\u0643\u0645\u0627\u0646\u0633\u062a\u0627\u0646"},"content":{"rendered":"<h2>\u0646\u0638\u0631\u0629 \u0639\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/h2>\n<table>\n<thead>\n<tr>\n<th>\u0627\u0644\u0628\u0646\u062f<\/th>\n<th>\u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0627\u0633\u0645 \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/td>\n<td>Municipal Wastewater MBR Membrane Replacement Project<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0645\u0648\u0642\u0639<\/td>\n<td>Turkmenistan<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0633\u0646\u0629<\/td>\n<td>June 2020<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u062a\u0637\u0628\u064a\u0642<\/td>\n<td>Municipal Wastewater Treatment<\/td>\n<\/tr>\n<tr>\n<td>Treatment Capacity<\/td>\n<td>60,000m\u00b3\/d<\/td>\n<\/tr>\n<tr>\n<td>Project Type<\/td>\n<td>MBR Membrane Replacement<\/td>\n<\/tr>\n<tr>\n<td>Supply Scope<\/td>\n<td>MBR Membrane Curtains<\/td>\n<\/tr>\n<tr>\n<td>Delivery<\/td>\n<td>5 Batches<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>\u062e\u0644\u0641\u064a\u0629 \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/h2>\n<p>This project was part of a government procurement program for a municipal wastewater treatment plant. The plant was already operating with a biological + MBR process, and required replacement of aging membrane curtains to maintain system performance.<\/p>\n<p>Instead of rebuilding the system, the client selected membrane replacement to upgrade the existing treatment process.<\/p>\n<h2>\u0627\u0644\u062d\u0644 \u0627\u0644\u0639\u0644\u0627\u062c\u064a<\/h2>\n<p>The client provided technical specifications including membrane fiber and module parameters. Based on these requirements, membrane curtains were manufactured and supplied for system replacement.<\/p>\n<p>A total of 5 batches of MBR membrane curtains were delivered and installed in the existing MBR system.<\/p>\n<h2>\u062a\u0643\u0627\u0645\u0644 \u0627\u0644\u0646\u0638\u0627\u0645<\/h2>\n<p>The supplied membrane curtains were directly integrated into the existing wastewater treatment system, replacing the old membranes without modifying the original process<\/p>\n<h2>\u0627\u0644\u0646\u062a\u0627\u0626\u062c \u0627\u0644\u0631\u0626\u064a\u0633\u064a\u0629<\/h2>\n<ul>\n<li>Treatment plant capacity: 60,000m\u00b3\/d<\/li>\n<li>5 batches of membrane curtains delivered<\/li>\n<li>Successful integration into existing MBR system<\/li>\n<li>Stable operation after replacement<\/li>\n<li>Improved reliability of wastewater treatment process<\/li>\n<\/ul>\n<h2>\u0623\u0628\u0631\u0632 \u0645\u0645\u064a\u0632\u0627\u062a \u0627\u0644\u0645\u0634\u0631\u0648\u0639<\/h2>\n<ul>\n<li>MBR membrane replacement project<\/li>\n<li>Suitable for municipal wastewater treatment plants<\/li>\n<li>Custom production based on client specifications<\/li>\n<li>Compatible with existing system design<\/li>\n<li>Stable performance after installation<\/li>\n<\/ul>\n<h2>\u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a<\/h2>\n<ul>\n<li>Municipal wastewater treatment plants<\/li>\n<li>MBR system upgrades and retrofits<\/li>\n<li>Membrane replacement projects<\/li>\n<li>Wastewater treatment plant maintenance<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1146\" src=\"http:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Municipal-Wastewater-MBR-Membrane-Replacement-Project-in-Turkmenistan.webp\" alt=\"Municipal Wastewater MBR Membrane Replacement Project in Turkmenistan\" width=\"534\" height=\"330\" srcset=\"https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Municipal-Wastewater-MBR-Membrane-Replacement-Project-in-Turkmenistan.webp 534w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Municipal-Wastewater-MBR-Membrane-Replacement-Project-in-Turkmenistan-300x185.webp 300w, https:\/\/banott.com\/wp-content\/uploads\/2026\/04\/Municipal-Wastewater-MBR-Membrane-Replacement-Project-in-Turkmenistan-18x12.webp 18w\" sizes=\"auto, (max-width: 534px) 100vw, 534px\" \/><\/p>","protected":false},"excerpt":{"rendered":"<p>\u0642\u0627\u0645\u062a \u0625\u062d\u062f\u0649 \u0645\u062d\u0637\u0627\u062a \u0645\u0639\u0627\u0644\u062c\u0629 \u0645\u064a\u0627\u0647 \u0627\u0644\u0635\u0631\u0641 \u0627\u0644\u0635\u062d\u064a \u0627\u0644\u0628\u0644\u062f\u064a\u0629 \u0641\u064a \u062a\u0631\u0643\u0645\u0627\u0646\u0633\u062a\u0627\u0646 \u0628\u062a\u062d\u062f\u064a\u062b \u0646\u0638\u0627\u0645 MBR \u0627\u0644\u062d\u0627\u0644\u064a \u0645\u0646 \u062e\u0644\u0627\u0644 \u0627\u0633\u062a\u0628\u062f\u0627\u0644 \u0627\u0644\u0633\u062a\u0627\u0626\u0631 \u0627\u0644\u063a\u0634\u0627\u0626\u064a\u0629 \u0627\u0644\u0642\u062f\u064a\u0645\u0629. \u0648\u0642\u062f \u062a\u0645 \u062a\u0648\u0631\u064a\u062f \u0645\u0627 \u0645\u062c\u0645\u0648\u0639\u0647 5 \u062f\u0641\u0639\u0627\u062a \u0645\u0646 \u0623\u063a\u0634\u064a\u0629 MBR \u0648\u062a\u0645 \u062a\u0634\u063a\u064a\u0644\u0647\u0627 \u0628\u0646\u062c\u0627\u062d\u060c \u0645\u0645\u0627 \u064a\u062f\u0639\u0645 \u0623\u062f\u0627\u0621 \u0627\u0644\u0646\u0638\u0627\u0645 \u0627\u0644\u0645\u0633\u062a\u0642\u0631.<\/p>","protected":false},"featured_media":1146,"comment_status":"closed","ping_status":"closed","template":"","case_cat":[24,4],"class_list":["post-1145","cases","type-cases","status-publish","has-post-thumbnail","hentry","case_cat-wastewater-treatment","case_cat-mbr"],"acf":[],"_links":{"self":[{"href":"https:\/\/banott.com\/ar\/wp-json\/wp\/v2\/cases\/1145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banott.com\/ar\/wp-json\/wp\/v2\/cases"}],"about":[{"href":"https:\/\/banott.com\/ar\/wp-json\/wp\/v2\/types\/cases"}],"replies":[{"embeddable":true,"href":"https:\/\/banott.com\/ar\/wp-json\/wp\/v2\/comments?post=1145"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banott.com\/ar\/wp-json\/wp\/v2\/media\/1146"}],"wp:attachment":[{"href":"https:\/\/banott.com\/ar\/wp-json\/wp\/v2\/media?parent=1145"}],"wp:term":[{"taxonomy":"case_cat","embeddable":true,"href":"https:\/\/banott.com\/ar\/wp-json\/wp\/v2\/case_cat?post=1145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}